Tunnel pipework

Start 9 Individual Solutions 9 Tunnel pipework

Piping for different requirements in the test room

We offer a holistic system from the vehicle to the measuring system. In addition to the described components of the adaptation of the tail pipe and merging, this also includes measurement tunnel piping. After intensive planning and construction, the tunnel piping is installed by us in the customer’s test room.

This includes the complete requirements from the vehicle to the measuring equipment, as well as the further discharge up to the exhaust blower and chimney connection. We also carry out modifications, modernizations and test stand-specific individual solutions.

Exhaust blower, chimney connections and pipes – all from a single source